Turns a marked review sheet into shipped reviews: one for each row the
reviewer confirmed ("yes", "y", "ok"), of the case's answer as it is
now. Rows left blank are left out. A row naming a case the suite
doesn't have, marked anything else, or showing an answer other than the
case's answer now (it changed after the sheet was made) stops it: a
case whose answer should change is edited in the suite first, then
reviewed again on a new sheet.
Turns a marked review sheet into shipped reviews: one for each row the reviewer confirmed ("yes", "y", "ok"), of the case's answer as it is now. Rows left blank are left out. A row naming a case the suite doesn't have, marked anything else, or showing an answer other than the case's answer now (it changed after the sheet was made) stops it: a case whose answer should change is edited in the suite first, then reviewed again on a new sheet.